PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

2nd floor Exterior metal framing Facing North.jpg Curtain Wall Mullions 1.jpg Installed door frames at Stair -4 Facing East.jpg Installed sprinkler branches-heads at the 3rd floor Facing North.jpg Installing Monumental Stairs Facing South.jpg
Next page 2nd floor Exterior metal framing Facing North
2nd floor Exterior metal framing Facing North